12 January was our first running day for 2014 - a brilliantly fine day - featuring cab rides in our shunting locomotive Tr189.
Tr189 passing through the double slip on another run
Tr189 on mainline heading towards the pedestrian crossing
And the day before - volunteers take a break from fitting flashings to train doors on the rail vehicle shed