|
1 |
What is the history of the Rimutaka Incline Railway? |
|
2 |
How did the restoration proposal originate? |
|
3 |
What progress has the Rimutaka Incline Railway Heritage Trust made? |
|
4 |
What other approvals are necessary before construction can proceed past Maymorn? |
|
5 |
What is the application to Greater Wellington Regional Council seeking? |
|
6 |
What is the cultural significance of the Rimutaka Incline Railway? |
|
7 |
What is the International significance of the Rimutaka Incline Railway? |
|
8 |
What is the significance of the Rimutaka region? |
|
9 |
Have railway reinstatements been successful elsewhere? |
|
10 |
What community consultation has taken place? |
|
11 |
Will any private properties be affected? |
|
12 |
Where will the main station and operational base be located? |
|
13 |
How will Maymorn be connected with the heritage railway formation? |
|
14 |
What is the plan for Kaitoke? |
|
15 |
How will vehicles access Mount Climie? |
|
16 |
What access changes will there be for Greater Wellington Regional Council forest activities? |
|
17 |
How will current walking and cycling activities be catered for? |
|
18 |
How will heritage features of the route be protected? |
|
19 |
Are the tunnels safe to use? |
|
20 |
Will the old timber bridges on the line be used? |
|
21 |
How will the line be constructed? |
|
22 |
How will the railway formation be restored? |
|
23 |
What will the reinstated railway track look like? |
|
24 |
Who will construct the railway? |
|
25 |
What locomotives will be used to build and operate the line? |
|
26 |
What about the Fell locomotives? |
|
27 |
What carriages will be used? |
|
28 |
Who will operate the line? |
|
29 |
What is the broad construction timeline? |
|
30 |
How much will the railway cost to build? |
|
31 |
How will the railway construction be funded? |
|
32 |
What communication systems will be needed? |
|
33 |
What emergency management procedures will be in place? |
|
34 |
How will the railway affect tourism in Upper Hutt and the Wellington region? |
|
35 |
What employment opportunities will be created by the railway? |
|
36 |
What is the likely effect on wildlife? |
|
37 |
What effects will there be for Tunnel Gully Scenic Reserve? |
|
38 |
What is the likely effect on registered heritage items? |
|
39 |
What effects will there be for tangata whenua? |
|
40 |
How will the heritage character and intrinsic fabric of the railway be retained? |
|
41 |
How will items of intrinsic heritage fabric be protected? |
|
42 |
Will original cuttings and embankments be retained? |
|
43 |
How will the risk of fire be managed? |
|
44 |
How will weeds be controlled? |
|
45 |
What will be done to protect significant vegetation? |
|
46 |
What will be done if significant flora, fauna or cultural artefacts are discovered? |
|
47 |
What will be done to minimise environmental impacts during construction, and how will construction works be rehabilitated? |
|
48 |
How will traffic and parking demands at Maymorn and Kaitoke be managed? |
|
49 |
How will current walking, cycling and other recreational activities along the rail trail be catered for? |
|
50 |
How are effects at Maymorn being managed? |
|
51 |
How will effects at Kaitoke be managed? |
|
52 |
How will the railway be operated safely? |
|
53 |
What impact will additional visitors make to the area? |
|
54 |
Who will be responsible for the on-going viability of the railway? |
|
55 |
Can steam locomotives be sustainably operated? |