19
The tunnels were built about the same time as the tunnels currently in use on the Johnsonville line. As part of the reinstatement a full engineering assessment will be undertaken. The scope of works will likely include drainage work inside and outside the tunnels, repointing of block-work and other minor restorative work. The Trust will develop a Heritage Conservation Management Plan for the tunnels to ensure that intrinsic fabric is maintained wherever practicable.
